Go Top
   
 
 
 
 
 
Item
Detailed Contents
Remark
Technical Knowhow
Refurbishment
224 tools
Domestic: Samsung and Hynix etc.
Oversea: China and Japan
Cost Saving
30%¡è cost saving compare with new equipment
Same performance as new equipment
: Particle, E/R, Uniformity etc.
Software
NIWIN GUI Program, PLC/PC, SECS(Host/FDC), etc.
Capa.
Clean Room
2640§³(800pyeong)
NIWIN Factory: 4,500§³
Refurbish
2 System/month
24 System/year
Delivery
6 Months
Required additional production period according to parts supply
Process Spec
Possible to respond to customer requirements for specification
- For each Process Design Rule: E/R, Particle, Uniformity etc.
Refurbishment maker
JET, TEL, KCTECH, SHIBAURA
NIWIN used equipment : 60(8¡±/12¡±, Batch)
Process Application
Possible to apply process application for customer customization
- SiN Remove, PR Strip, Oxide Etch
- FEOL, BEOL, Pre, IMD, Metal Reclaim
- HSN, AL Etch, ORG Strip, etc.
Semiconductor Wet Process
Equipment Refurbish Procedure
Used equipment(Fab Out) ¡æ Confirmation of Customer Specifications and Design/Manufacture for the all parts(body, frame, bath, etc.) ¡æ NIWIN software setup
(PLC, PC, SECS, FDC) ¡æ Equipment setting and Auto run test & Final Inspection before shipment
¢¡ NIWIN refurbished equipment has the same performance as new equipment!